Snagging & handover

When an off-plan Dubai unit completes, there's a sequence between the developer's completion notice and you holding the title deed — snagging inspection, defect rectification, final payment, DLD transfer, then keys. It's the step buyers most often rush. Here's how to take it in the right order.

The completion sequence

1 — Completion notice

The developer issues a handover notice once the building secures its Building Completion Certificate and (for the unit) the relevant authority sign-off. This starts the clock: you typically have a defined window to inspect, settle, and take possession.

2 — Snagging inspection

Before you accept the keys, inspect the unit (or send a professional snagging company) for defects — finishes, joinery, AC, plumbing, electrics, water pressure, door/window alignment. Document every snag with photos against a written checklist; this is your leverage while the developer still owes a fix.

3 — Developer rectification

Submit the snag list. The developer rectifies legitimate defects before or shortly after handover. Re-inspect to confirm fixes rather than signing off on promises. Cosmetic vs structural snags are treated differently — know which is which.

4 — Final payment + fees

Settle the final instalment plus the 4% DLD transfer fee, admin fees, and any outstanding service-charge pre-payment. Title cannot transfer until the developer confirms zero outstanding balance (the NOC).

5 — DLD title transfer

The unit is registered in your name at the Dubai Land Department and the title deed issues — converting the interim Oqood registration into a full title deed. Only now are you the legal owner, not just a contracted purchaser.

6 — Key handover

Keys, access cards, and the DEWA/cooling account activation follow title transfer. Take meter readings on the day and open utility accounts before you (or a tenant) move in.

What to look for in a snag list

Severity drives urgency — structural snags must be fixed before sign-off.

Defect categorySeverityNote
Water ingress / dampstructuralStains, leaks around windows or bathrooms — a structural snag that worsens; never sign off until fully resolved.
AC / MEP performancestructuralCooling that doesn't reach spec, weak water pressure, tripping circuits — expensive to chase after handover.
Joinery + finishesfinishMisaligned doors, gaps in cabinetry, uneven tiling, paint defects — standard snags the developer should rectify.
Fixtures + fittingsfinishMissing or wrong-spec sanitaryware, handles, sockets vs the contract spec sheet — check against what you paid for.
Surface markscosmeticScuffs, minor scratches — log them, but they rarely justify delaying handover on their own.

Four realities at handover

Don't accept keys before snagging

Once you take possession and sign the handover form, your leverage drops sharply. Inspect first, list defects, get the rectification commitment in writing — then accept. A few extra days here saves months of chasing later.

Know your defect-liability period

UAE developers carry a defect-liability period after handover (commonly 1 year for general defects, longer for major structural elements). Report defects in writing within the period so the obligation to fix is preserved.

Title transfer is the real milestone

Until the DLD title deed issues in your name, you hold a contractual interest, not ownership. Confirm the Oqood → title-deed conversion completed; don't treat key handover alone as the finish line.

Budget the handover cash stack

Final instalment + 4% DLD + admin + a service-charge pre-payment can land all at once. None of it is mortgageable on an off-plan completion — plan the liquidity before the completion notice arrives.